Pinery Water: proposed water budget vs. current tiered rates
541 parcels · each lot's outdoor budget from the District's method · residential 3/4" meter · water usage charges only (base fee and Water Project Fee are the same under both)
Parcel detail
Click a parcel above to see its month-by-month bills. You can type in actual meter readings to replace the assumed use.
How this is calculated, and the assumptions
- Outdoor budget (District method): irrigable area = 30% of lot (capped at 13,000 sq ft) × monthly ET (Apr 3.65, May 4.45, Jun 4.90, Jul 5.85, Aug 4.85, Sep 3.50, Oct 1.80 in) × 0.623 gal/sq ft·in. Indoor allowance is 5,000 gal/mo. The District's own example checks out: 0.25 ac in July gives a total budget of 16,907 gal.
- Current (2026) rates, 3/4" meter, per 1,000 gal: 0–5k $2.82 · 5–20k $4.42 · 20–30k $5.59 · 30–50k $7.27 · 50k+ $11.79.
- Proposed (2027 draft) water budget rates, per 1,000 gal: $2.82 · $4.42 · $8.54 · $13.85.
Apr–Oct, lots under ½ acre: Tier 1 is indoor (first 5,000 gal) · Tier 2 is outdoor inside budget · Tier 3 is outside budget while year-to-date use is under 0.55 AF (179,218 gal) · Tier 4 is outside budget above 0.55 AF.
Lots ½ acre and up: Tier 2 is inside budget under 0.55 AF · Tier 3 is inside budget over 0.55 AF · Tier 4 is any use outside budget.
Nov–Mar, all lots: 0–5k $2.82 · 5–20k $4.42 · 20–30k $8.54 · 30k+ $13.85.
- Assumption: tier-to-price mapping. The draft Exhibit A's text comes out scrambled. It lists the four prices three times, once each for winter, summer under ½ ac, and summer over ½ ac. I read them in tier order 1→4. Confirm at the hearing.
- Assumption: 0.55 AF is counted cumulatively on total metered use from January. The draft doesn't say whether that's year-to-date or something else.
- Every parcel in this list is under ½ acre (largest is 0.459 ac). The 13,000 sq ft cap and the over-½-acre tiers never apply here.
- Usage is a scenario: indoor use plus a chosen % of each month's outdoor budget, Apr–Oct. Winter is indoor only. Actual bills depend on real meter reads; enter them in the parcel detail.
- Not modeled: sewer, which is based on winter use and is the same under both structures (2027 draft: $39.59 / $58.15 vs. 2026: $39.00 / $57.29), the groundwater fee, and meters larger than 3/4".
- Sources: Pinery Water 2026 Rates & Fees (final), 2027 Rates & Fees DRAFT (Nov 18, 2026 hearing), "How to calculate your Water Budget," Water Budget FAQs. Parcel acreage comes from Douglas County parcel data.